KY 26 in Whitley County will be reduced to one lane between milepoints 0-1 from 8 a.m. to 5 p.m. Monday (September 28,) Tuesday (September 29) and Wednesday (September 30) for the purpose of culvert repair and replacement.
All work is scheduled on a tentative basis and is subject to change depending on weather conditions, emergencies and other factors beyond the control of the Department of Highways.
The Kentucky Transportation Cabinet asks motorists to be aware of the work zone and to utilize safe driving habits when traveling through the area.


